Even with the adverse weather conditions , progress of works has still carried on with numerous trades battling through the elements. As seen in the pictures, ceiling insulation and plasterboard has now started to the flats. The UPVC windows are mostly installed to Area B and the screed has just been poured to the section where the crane was originally positioned.

 